Walsh Bay Arts Precinct Wharf 4&5

Preliminary Works

  • Survey and prepare a dilapidation report of external cladding of Wharf 4 and 5.

Main Works

  • Repair the replace 11,000m2 of flooring in Wharf 4&5.
  • Supply and install timber battens, acoustic underlay, galvabond, plywood flooring, fibre cement sheeting, parquetry flooring, engineered timber board, harlequin liberty sprung floor panel system.
  • Waterproof heritage windows.
  • Repair superstructure wall frame.
  • Construct reveal frame for the roof gable louvre.
  • Prepare and reinstall hardwood timber ceiling cladding.
  • Remove, repair and reinstall sills and wall frames.
  • Remove, repair and reinstall cargo doors.
  • Remove and refit window reveals.
  • Remove and refit external door timber frames.
  • Repair façade and external cladding.

Main Builder

Richard Crookes

Completion

September 2020