The Establishment Hotel restoration
Main Works
Relaying original joists, herring bone noggins and flooring. Reproduction of the original ceiling on the ground floor (now the Marble Bar) using as much of the original fabric as possible, recreated the V-Board lining in the ceiling with a 500mm cornice, cladding the steel beams over the original ornate steel columns.
Main Builder
Multiplex Constructions
Completion
July 2000